2017-10-31 | Burrnette, Stan | BUR122 | 7 | ST | Linnet | LINN85 | 5004 | Framing | Hung crawl space door. Got supplies. Put on door handle. Cut out threshold on deck door. Took down tarps over sawdust pile and installed fiberglass roofing. | One Time Client | 2017-11-01 19:41:27 | 0 |
2017-10-26 | Burrnette, Stan | BUR122 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Cut stair treads and risers for Damon. Dug out for footings around back. Wrapped posts with 5/8 plywood. | One Time Client | 2017-10-26 19:05:15 | 0 |
2017-10-24 | Burrnette, Stan | BUR122 | 4.5 | ST | Linnet | LINN85 | 5038 | Rock Work | Worked on backrest for firepit bench. | One Time Client | 2017-10-24 17:32:02 | 0 |
2017-10-23 | Burrnette, Stan | BUR122 | 6.5 | ST | Linnet | LINN85 | 5038 | Rock Work | Finished granite stair treads. | One Time Client | 2017-10-23 20:29:30 | 0 |
2017-10-20 | Burrnette, Stan | BUR122 | 8.5 | ST | Linnet | LINN85 | 5038 | Rock Work | Cut stair treads. Installed firepit bench seat. | One Time Client | 2017-10-20 16:35:35 | 0 |
2017-10-19 | Burrnette, Stan | BUR122 | 8 | ST | Linnet | LINN85 | 5038 | Rock Work | Moved some firepit bench parts around. Mortared bottom section into place. Started placing stairs treads in place. | One Time Client | 2017-10-19 17:18:37 | 0 |
2017-10-18 | Burrnette, Stan | BUR122 | 9 | ST | Linnet | LINN85 | 5031 | Decks | Moved lifts of rock with bobcat. | One Time Client | 2017-10-18 18:22:16 | 0 |
2017-10-17 | Burrnette, Stan | BUR122 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | Framed in walls, took down old stucco. Sheeted out side walls. | Precision Marble | 2017-10-18 18:23:04 | 0 |
2017-10-16 | Burrnette, Stan | BUR122 | 5 | ST | Linnet | LINN85 | 5031 | Decks | Took apart crates. Put in fireplace. Started rock facing on wall. | One Time Client | 2017-10-17 18:30:32 | 0 |
2017-10-13 | Burrnette, Stan | BUR122 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Made scaffolding, sheeted 2nd floor wall. Put up trusses. | One Time Client | 2017-10-13 18:38:58 | 0 |
2017-10-12 | Burrnette, Stan | BUR122 | 10.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Sheeted garage walls and plut on top plates. Cleaned up garbage. Helped build and stand up walls on top floor. | One Time Client | 2017-10-12 21:20:27 | 0 |
2017-10-11 | Burrnette, Stan | BUR122 | 10.5 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | Put up triple beam header for garage. Nailed in hangers. Sheeted top floor. | One Time Client | 2017-10-12 21:22:37 | 0 |
2017-10-10 | Burrnette, Stan | BUR122 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Framed in remaining walls for second floor. Cut for Louie and Damon. Stick framed garage wall. | One Time Client | 2017-10-10 19:10:24 | 0 |
2017-10-05 | Burrnette, Stan | BUR122 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Installed floor joists for second floor and sheeted. Installed rim joists, and beams. | One Time Client | 2017-10-05 18:43:06 | 0 |
2017-10-04 | Burrnette, Stan | BUR122 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Cut for Damon and Louie. Finished floor. Framed and sheeted walls. | One Time Client | 2017-10-04 17:41:00 | 0 |
2017-10-03 | Burrnette, Stan | BUR122 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Stick framed wall for garage. sheeted. Dropped in and nailed floor joists. Started sheeting floor. | One Time Client | 2017-10-03 19:12:01 | 0 |
2017-10-27 | Demo, Arrow | DEM217 | 4 | ST | Black Residence | BLAC70 | 5004 | Framing | n/a | Cats Eye Contracting | 2017-11-08 08:18:25 | 0 |
2017-10-19 | Demo, Heather | DEM242 | 1 | ST | Central | CENT74 | 5024 | Electrical Work | test entry after new user set up by Sean | One Time Client | 2017-10-20 12:52:25 | 0 |
2017-10-31 | Foreman, Demo | FOR125 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | trusses and sheeting | One Time Client | 2017-11-02 22:39:45 | 0 |
2017-10-30 | Foreman, Demo | FOR125 | 8 | ST | Cowichan Lake | COWI76 | 5004 | Framing | tall wall in stairway | One Time Client | 2017-10-30 18:48:21 | 0 |
2017-10-27 | Foreman, Demo | FOR125 | 8 | ST | Cowichan Lake | COWI76 | 5004 | Framing | sheeting roof and blocking gable help nate with forms | One Time Client | 2017-10-30 18:46:36 | 0 |
2017-10-26 | Foreman, Demo | FOR125 | 8 | ST | Cowichan Lake | COWI76 | 5004 | Framing | sheeting roof and lookouts | One Time Client | 2017-10-30 18:44:37 | 0 |
2017-10-25 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | sheeting roof and blocking gables andputting up lookouts | One Time Client | 2017-10-26 18:42:35 | 0 |
2017-10-24 | Foreman, Demo | FOR125 | 4.5 | ST | Linnet | LINN85 | 5031 | Decks | granit bench seat with ready rod | One Time Client | 2017-10-24 19:21:50 | 0 |
2017-10-23 | Foreman, Demo | FOR125 | 8 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | septic hole @ footing trenches dug and material moved up top | One Time Client | 2017-10-24 19:17:36 | 0 |
2017-10-20 | Foreman, Demo | FOR125 | 7.5 | ST | 714 Newport | 71464 | 5004 | Framing | did bay in garage | Precision Marble | 2017-10-21 08:59:35 | 0 |
2017-10-19 | Foreman, Demo | FOR125 | 8.5 | ST | 832 Newport | 83265 | 5004 | Framing | framed in basement and made stairs | Precision Marble | 2017-10-19 21:47:56 | 0 |
2017-10-18 | Foreman, Demo | FOR125 | 8.5 | ST | 832 Newport | 83265 | 5004 | Framing | framed basement in | Precision Marble | 2017-10-19 21:46:37 | 0 |
2017-10-17 | Foreman, Demo | FOR125 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | framed inbasement | Precision Marble | 2017-10-19 21:45:31 | 0 |
2017-10-16 | Foreman, Demo | FOR125 | 10 | ST | Cowichan Lake | COWI76 | 5004 | Framing | beam over master and trusses finnish garage trusses start outriggers | One Time Client | 2017-10-17 06:30:39 | 0 |
2017-10-13 | Foreman, Demo | FOR125 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | truss delivery straightened walls erected trusses | One Time Client | 2017-10-15 09:44:44 | 0 |
2017-10-12 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | walls top floor and sheeting | One Time Client | 2017-10-15 09:38:15 | 0 |
2017-10-11 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | stratn all walls , installed all beams and hangers and sheeted | One Time Client | 2017-10-11 21:11:57 | 0 |
2017-10-10 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | 2nd floor interior walls and cripples | One Time Client | 2017-10-11 21:06:25 | 0 |
2017-10-09 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | walls and sheeting 2 floor | One Time Client | 2017-10-11 21:03:24 | 0 |
2017-10-06 | Foreman, Demo | FOR125 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | 2 walls framed on garage level and sheeted | One Time Client | 2017-10-07 07:55:47 | 0 |
2017-10-05 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | main floor finnished and big beams too | One Time Client | 2017-10-07 07:53:32 | 0 |
2017-10-04 | Foreman, Demo | FOR125 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | finnish main floor , built exterior wallsforr second floor beams and joists | One Time Client | 2017-10-04 19:13:04 | 0 |
2017-10-03 | Foreman, Demo | FOR125 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | framed main floor | One Time Client | 2017-10-04 19:10:39 | 0 |
2017-10-02 | Foreman, Demo | FOR125 | 7.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | yep | One Time Client | 2017-10-04 19:08:22 | 0 |
2017-10-19 | Kavalovsky, Tyler | KAV123 | 6.5 | ST | Black Residence | BLAC70 | 5026 | Drywall | drywall, vapour seal, cleanup | Cats Eye Contracting | 2017-10-25 20:31:59 | 0 |
2017-10-18 | Kavalovsky, Tyler | KAV123 | 7.5 | ST | Black Residence | BLAC70 | 5026 | Drywall | strapping, drywall, vapour seal | Cats Eye Contracting | 2017-10-25 20:30:54 | 0 |
2017-10-17 | Kavalovsky, Tyler | KAV123 | 4 | ST | Black Residence | BLAC70 | 5004 | Framing | leveling strapping and putting in backing | Cats Eye Contracting | 2017-10-17 18:23:30 | 0 |
2017-10-17 | Kavalovsky, Tyler | KAV123 | 4 | ST | Black Residence | BLAC70 | 5026 | Drywall | pickup and install of ceiling drywall | Cats Eye Contracting | 2017-10-17 18:24:03 | 0 |
2017-10-16 | Kavalovsky, Tyler | KAV123 | 8 | ST | Black Residence | BLAC70 | 5004 | Framing | strapping and leveling of ceiling | Cats Eye Contracting | 2017-10-17 18:25:08 | 0 |
2017-10-13 | Kavalovsky, Tyler | KAV123 | 6.5 | ST | Black Residence | BLAC70 | 5004 | Framing | put on second layer of sub-floor. layout and started installing strapping on ceiling | Cats Eye Contracting | 2017-10-13 20:42:31 | 0 |
2017-10-13 | Kavalovsky, Tyler | KAV123 | 1.5 | ST | Black Residence | BLAC70 | 5017 | Demolition | cleanup, garbage run and tool pickup | Cats Eye Contracting | 2017-10-13 20:43:12 | 0 |
2017-10-12 | Kavalovsky, Tyler | KAV123 | 7.5 | ST | Black Residence | BLAC70 | 5004 | Framing | finished venting and insulation of floor. finished sheathing sub floor. insulated walls. cleanup | Cats Eye Contracting | 2017-10-13 20:39:45 | 0 |
2017-10-11 | Kavalovsky, Tyler | KAV123 | 6 | ST | Black Residence | BLAC70 | 5004 | Framing | vented, insulated part of the floor and sheathed. finished blocking perimeter. room and yard cleanup. took all wood down stairs and stacked it. | Cats Eye Contracting | 2017-10-13 20:37:06 | 0 |
2017-10-10 | Kavalovsky, Tyler | KAV123 | 8.5 | ST | Black Residence | BLAC70 | 5004 | Framing | floor sheathing blocking. venting strips, insulation, floor sheathing, lots of cleanup. | Cats Eye Contracting | 2017-10-10 19:09:47 | 0 |
2017-10-06 | Kavalovsky, Tyler | KAV123 | 6 | ST | Black Residence | BLAC70 | 5004 | Framing | blocking and framing in window openings. David wants the room fully insulated until windows arrive. | Cats Eye Contracting | 2017-10-06 16:49:41 | 0 |
2017-10-05 | Kavalovsky, Tyler | KAV123 | 3 | ST | Black Residence | BLAC70 | 5017 | Demolition | floor removal and cleanup | Cats Eye Contracting | 2017-10-06 16:43:28 | 0 |
2017-10-05 | Kavalovsky, Tyler | KAV123 | 5.5 | ST | Black Residence | BLAC70 | 5004 | Framing | blocking between floor joists under exterior wall | Cats Eye Contracting | 2017-10-06 16:44:32 | 0 |
2017-10-04 | Kavalovsky, Tyler | KAV123 | 4 | ST | Black Residence | BLAC70 | 5017 | Demolition | floor removal and cleanup | Cats Eye Contracting | 2017-10-06 16:41:09 | 0 |
2017-10-03 | Kavalovsky, Tyler | KAV123 | 8 | ST | Black Residence | BLAC70 | 5004 | Framing | framing interior wall. cleanup | Cats Eye Contracting | 2017-10-03 20:08:23 | 0 |
2017-10-02 | Kavalovsky, Tyler | KAV123 | 8.5 | ST | Black Residence | BLAC70 | 5004 | Framing | finished 2x6 wall ROs. started 2x4 inner wall and some replacing of curved roof members. cleanup | Cats Eye Contracting | 2017-10-02 20:26:44 | 0 |
2017-10-31 | Morris, Sam | MOR127 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | framed the 30ft wall and finished the trusses did a bit of sheathing | One Time Client | 2017-10-31 21:09:52 | 0 |
2017-10-31 | Morris, Nathan | MOR128 | 8 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Install backframing for plumber | One Time Client | 2017-11-08 21:30:04 | 0 |
2017-10-30 | Morris, Sam | MOR127 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | working on the 30ft wall and did a bit of sheathing | One Time Client | 2017-10-30 21:39:28 | 0 |
2017-10-30 | Morris, Nathan | MOR128 | 8 | ST | Cowichan Lake | COWI76 | 5004 | Framing | More back framing | One Time Client | 2017-11-08 21:29:38 | 0 |
2017-10-27 | Morris, Sam | MOR127 | 8.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | putting on subfacia and outriggers and sheathing | One Time Client | 2017-10-29 23:58:24 | 0 |
2017-10-27 | Morris, Nathan | MOR128 | 8 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | fahking retaining wall- | One Time Client | 2017-11-08 21:28:30 | 0 |
2017-10-26 | Morris, Sam | MOR127 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | roofwork | One Time Client | 2017-10-26 18:04:53 | 0 |
2017-10-26 | Morris, Nathan | MOR128 | 8 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | footings out back. sheating etc. | One Time Client | 2017-10-26 20:01:32 | 0 |
2017-10-25 | Morris, Nathan | MOR128 | 5.5 | ST | 714 Newport | 71464 | 5006 | Foundation | got blue, sand ,ixer, cement, poured, returned mixer. | Precision Marble | 2017-10-26 19:42:42 | 0 |
2017-10-25 | Morris, Sam | MOR127 | 5.5 | ST | Black Residence | BLAC70 | 5026 | Drywall | boarded the wall we were waitin on the plumber for masde a piece for the cabin floor patch cleaned and vacuumed | Cats Eye Contracting | 2017-10-25 18:32:22 | 0 |
2017-10-25 | Morris, Sam | MOR127 | 1 | ST | Linnet | LINN85 | 5031 | Decks | cleaing and spreading grout | One Time Client | 2017-10-25 18:32:57 | 0 |
2017-10-25 | Morris, Sean | MOR114 | 2 | ST | #2 Uptown Addition | #2U111 | p-9875 | Computer IT support | test | Heatherbrea | 2017-10-25 09:46:39 | 0 |
2017-10-24 | Morris, Nathan | MOR128 | 5.5 | ST | 714 Newport | 71464 | 5004 | Framing | firred out ceiling/wall a bit, made curb on front step. | Precision Marble | 2017-10-26 19:41:23 | 0 |
2017-10-24 | Morris, Sam | MOR127 | 6 | ST | Black Residence | BLAC70 | 5026 | Drywall | put in some drywall and subfloor cleaned up took a load to the dump | Cats Eye Contracting | 2017-10-25 01:28:43 | 0 |
2017-10-23 | Morris, Nathan | MOR128 | 8.5 | ST | 714 Newport | 71464 | 5004 | Framing | destroyed inside wall, put up soffit/barge | Precision Marble | 2017-10-26 19:38:04 | 0 |
2017-10-23 | Morris, Sam | MOR127 | 8 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | moving dirt outta lews way | One Time Client | 2017-10-24 00:05:16 | 0 |
2017-10-23 | Morris, Sean | MOR114 | 3 | ST | Millstream | MILL132 | 9999 | After Hours Call Out | test to delete | Heatherbrea | 2017-10-23 10:35:43 | 0 |
2017-10-21 | Morris, Xana | MOR126 | 2.5 | ST | Dungeon | DUNG79 | 5045 | Office administration | organized and sorted paper work. | One Time Client | 2017-10-21 19:24:00 | 0 |
2017-10-20 | Morris, Sam | MOR127 | 8 | ST | 714 Newport | 71464 | 5004 | Framing | built the bumb out walls sheated installed window bluskinned flashed papered roofed | Precision Marble | 2017-10-20 16:41:27 | 0 |
2017-10-20 | Morris, Nathan | MOR128 | 7.5 | ST | 714 Newport | 71464 | 5004 | Framing | worked on ''bay window'', | Precision Marble | 2017-10-26 19:36:00 | 0 |
2017-10-20 | Morris, Xana | MOR126 | 1.5 | ST | Dungeon | DUNG79 | 5045 | Office administration | sorted and organized paper work | One Time Client | 2017-10-21 19:23:08 | 0 |
2017-10-20 | Morris, Sean | MOR114 | 4 | ST | Linnet | LINN85 | 5031 | Decks | Worked on deck | One Time Client | 2017-10-20 14:48:54 | 0 |
2017-10-20 | Morris, Sean | MOR114 | 3.75 | ST | Millstream | MILL132 | 9875 | Bobcat | Bobcat work | Heatherbrea | 2017-10-20 14:48:16 | 0 |
2017-10-19 | Morris, Nathan | MOR128 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | prep/touchups, tv mount, banded desk | Precision Marble | 2017-10-26 19:34:42 | 0 |
2017-10-19 | Morris, Sam | MOR127 | 8.5 | ST | 832 Newport | 83265 | 5004 | Framing | some more backframing bluskined and flashed and papered window helped lew with stairs | Precision Marble | 2017-10-19 17:06:16 | 0 |
2017-10-19 | Morris, Sean | MOR114 | 8.5 | ST | Dungeon | DUNG79 | 5045 | Office administration | Office stuff | One Time Client | 2017-10-19 07:42:10 | 0 |
2017-10-19 | Morris, Sean | MOR114 | 1.5 | OT | Linnet | LINN85 | 5038 | Rock Work | Went through rock bill | One Time Client | 2017-10-19 07:44:00 | 0 |
2017-10-18 | Morris, Nathan | MOR128 | 8 | ST | 714 Newport | 71464 | 5012 | Exterior Finishing | installed gate by back stairs. | Precision Marble | 2017-10-26 19:32:48 | 0 |
2017-10-18 | Morris, Sam | MOR127 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | backframing put in a window did some papering | Precision Marble | 2017-10-18 18:02:56 | 0 |
2017-10-18 | Morris, Sean | MOR114 | 2.5 | ST | Dungeon | DUNG79 | 5045 | Office administration | Worked on app and other stuff | One Time Client | 2017-10-18 12:57:23 | 0 |
2017-10-17 | Morris, Nathan | MOR128 | 9.5 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | installed glass by stove, built/ installed ''desk'' under stairs | Precision Marble | 2017-10-26 19:30:48 | 0 |
2017-10-17 | Morris, Sam | MOR127 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | rippind off stucco framing walls sheathing | Precision Marble | 2017-10-17 23:10:44 | 0 |
2017-10-17 | Morris, Sean | MOR114 | 2.25 | ST | Ardmore Mixed Res | ARDM69 | 9875 | Bobcat | n/a | One Time Client | 2017-10-17 00:05:35 | 0 |
2017-10-17 | Morris, Sean | MOR114 | 5.25 | ST | Langford Duplex | LANG120 | 9875 | Bobcat | Test | One Time Client | 2017-10-17 00:11:20 | 10 |
2017-10-16 | Morris, Nathan | MOR128 | 10 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | windowblinds, went to sidney for glass, went to durrance | Precision Marble | 2017-10-26 19:29:19 | 0 |
2017-10-16 | Morris, Sam | MOR127 | 6 | ST | Cowichan Lake | COWI76 | 5004 | Framing | truss work | One Time Client | 2017-10-16 18:41:08 | 0 |
2017-10-16 | Morris, Sam | MOR127 | 3.5 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | moving dirt outta there | One Time Client | 2017-10-16 18:41:25 | 0 |
2017-10-16 | Morris, Sean | MOR114 | 4.75 | ST | 127 Obed | 127121 | p-9875 | Computer IT support | n/a | One Time Client | 2017-10-16 23:50:11 | 0 |
2017-10-16 | Morris, Sean | MOR114 | 0.75 | ST | Millstream | MILL132 | 9875 | Bobcat | n/a | Heatherbrea | 2017-10-16 18:23:05 | 0 |
2017-10-14 | Morris, Xana | MOR126 | 2 | ST | Dungeon | DUNG79 | 5045 | Office administration | sorted and organized paper work. | One Time Client | 2017-10-21 19:21:03 | 0 |
2017-10-14 | Morris, Nathan | MOR128 | 0.5 | ST | Dungeon | DUNG79 | 5045 | Office administration | went out to Elizabeth Young | One Time Client | 2017-10-26 20:00:27 | 0 |
2017-10-13 | Morris, Nathan | MOR128 | 8.5 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | touchups/cleanup, etc. | Precision Marble | 2017-10-26 19:27:57 | 0 |
2017-10-13 | Morris, Sam | MOR127 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | trowing up trusses | One Time Client | 2017-10-15 23:46:00 | 0 |
2017-10-13 | Morris, Xana | MOR126 | 4 | ST | Dungeon | DUNG79 | 5045 | Office administration | organized and sorted paper work. | One Time Client | 2017-10-21 19:20:22 | 0 |
2017-10-12 | Morris, Nathan | MOR128 | 10 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | started working on sairs | Precision Marble | 2017-10-26 19:27:00 | 0 |
2017-10-12 | Morris, Sam | MOR127 | 10.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | upper floor walls | One Time Client | 2017-10-12 22:36:50 | 0 |
2017-10-11 | Morris, Nathan | MOR128 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | patience with the floor, eh? | Precision Marble | 2017-10-11 19:20:19 | 0 |
2017-10-11 | Morris, Sam | MOR127 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | 4th floor floor and garbage burning | One Time Client | 2017-10-11 23:04:07 | 0 |
2017-10-11 | Morris, Sean | MOR114 | 2.75 | ST | 234 james rd | 234125 | 5029-1 | Cabinets-Hardware | the job is now finished. | Farmer Construction | 2017-10-11 11:48:46 | 0 |
2017-10-10 | Morris, Nathan | MOR128 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | cut out hardwood, had to get a bunch of stuff thru out the day... | Precision Marble | 2017-10-10 19:14:55 | 0 |
2017-10-10 | Morris, Sean | MOR114 | 1 | ST | 832 Newport | 83265 | 5007 | Excavation and Backfill | more trenching | Precision Marble | 2017-12-01 10:55:00 | 0 |
2017-10-10 | Morris, Sam | MOR127 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | 3rd floor and garage walls | One Time Client | 2017-10-11 22:57:45 | 0 |
2017-10-08 | Morris, Sean | MOR114 | 4.25 | ST | Towner Park | TOWN99 | 5036 | Building Envelope | Did some stuff | Precision Marble | 2017-10-08 18:13:26 | 0 |
2017-10-06 | Morris, Nathan | MOR128 | 2 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | made rounds for pool table legs | Precision Marble | 2017-10-10 19:15:50 | 0 |
2017-10-06 | Morris, Nathan | MOR128 | 5 | ST | 832 Newport | 83265 | 5006 | Foundation | holy mess-around of a pour | Precision Marble | 2017-10-10 19:17:02 | 0 |
2017-10-06 | Morris, Sam | MOR127 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | second floor walls and sheating | One Time Client | 2017-10-06 19:06:56 | 0 |
2017-10-05 | Morris, Sean | MOR114 | 1.5 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | set up tv netowork | Precision Marble | 2017-10-06 12:06:34 | 0 |
2017-10-05 | Morris, Nathan | MOR128 | 9.5 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | trimmed door, sealed showers, installed a drawer, closet rod, oven/side piece. | Precision Marble | 2017-10-11 18:45:21 | 0 |
2017-10-05 | Morris, Sam | MOR127 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | second floor walls and beams and flooring | One Time Client | 2017-10-05 18:12:48 | 0 |
2017-10-04 | Morris, Nathan | MOR128 | 9 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | sealed countertops, t.p. holds, drawer worked on, banded sink cover-durrance, damon's, lumberworld, durrance | Precision Marble | 2017-10-11 18:47:30 | 0 |
2017-10-04 | Morris, Sam | MOR127 | 10 | ST | Cowichan Lake | COWI76 | 5004 | Framing | framing up lower floor and doing the floor of second drove blue out to marys | One Time Client | 2017-10-05 18:11:53 | 0 |
2017-10-03 | Morris, Nathan | MOR128 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | etc. etc. etc, need to keep better track | Precision Marble | 2017-10-11 19:19:04 | 0 |
2017-10-03 | Morris, Sean | MOR114 | 1.75 | ST | Ardmore Mixed Res | ARDM69 | 5030 | Cleanup and Disposal | n/a | One Time Client | 2017-10-09 07:49:19 | 0 |
2017-10-03 | Morris, Sam | MOR127 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | built and sheated the garage wall for power and help with lower floor walls and joists | One Time Client | 2017-10-03 19:53:43 | 0 |
2017-10-02 | Morris, Nathan | MOR128 | 8 | ST | Black Residence | BLAC70 | 5001 | Flooring | playing around with rotten stuff | Cats Eye Contracting | 2017-10-11 19:17:51 | 0 |
2017-10-02 | Morris, Sam | MOR127 | 7.5 | ST | Cowichan Lake | COWI76 | 5009 | Plumbing | backfilling and layin sand for brandons pipe unloaded floor package | One Time Client | 2017-10-02 23:55:46 | 0 |
2017-10-02 | Morris, Sean | MOR114 | 3.25 | ST | Towner Park | TOWN99 | p-9875 | Computer IT support | n/a | Precision Marble | 2017-10-02 20:24:12 | 0 |
2017-10-02 | Morris, Sean | MOR114 | 2.75 | ST | Millstream | MILL132 | 5007 | Excavation and Backfill | n/a | Heatherbrea | 2017-10-09 07:48:18 | 0 |
2017-10-01 | Morris, Sam | MOR127 | 1.5 | ST | 832 Newport | 83265 | 5006 | Foundation | helping nate get heights and do some piping and lay down the poly and mesh | Precision Marble | 2017-10-01 23:02:23 | 0 |
2017-10-31 | Nazaroff, Stan | NAZ129 | 4 | ST | Dungeon | DUNG79 | 5045 | Office administration | misc tasks | One Time Client | 2017-11-01 13:59:40 | 0 |
2017-10-15 | Nazaroff, Stan | NAZ129 | 1 | ST | Dungeon | DUNG79 | 5045 | Office administration | visa receipts | One Time Client | 2017-11-27 13:29:18 | 0 |
2017-10-14 | Nazaroff, Stan | NAZ129 | 2 | ST | Dungeon | DUNG79 | 5045 | Office administration | mail | One Time Client | 2017-10-02 12:16:12 | 0 |
2017-10-14 | Nazaroff, Stan | NAZ129 | 5 | ST | Dungeon | DUNG79 | 5045 | Office administration | insurance receipts etc | One Time Client | 2017-11-27 13:28:35 | 0 |
2017-10-13 | Nazaroff, Stan | NAZ129 | 1 | ST | Dungeon | DUNG79 | 5045 | Office administration | mail etc | One Time Client | 2017-11-27 13:27:37 | 0 |
2017-10-12 | Nazaroff, Stan | NAZ129 | 4 | ST | Dungeon | DUNG79 | 5045 | Office administration | mail etc | One Time Client | 2017-11-27 13:27:05 | 0 |
2017-10-31 | Nishimura, Dan | NIS130 | 9 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | tie rebar and form foundation | One Time Client | 2017-10-31 21:47:06 | 0 |
2017-10-30 | Nishimura, Dan | NIS130 | 8.5 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | footing and foundation | One Time Client | 2017-10-30 19:46:48 | 0 |
2017-10-27 | Nishimura, Dan | NIS130 | 5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | sheet roof | One Time Client | 2017-10-27 18:29:24 | 0 |
2017-10-27 | Nishimura, Dan | NIS130 | 3.5 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | dig for footing | One Time Client | 2017-10-27 18:29:40 | 0 |
2017-10-26 | Nishimura, Dan | NIS130 | 3 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | dig footing | One Time Client | 2017-10-26 20:57:03 | 0 |
2017-10-26 | Nishimura, Dan | NIS130 | 5.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | stairs and roof | One Time Client | 2017-10-26 20:59:41 | 0 |
2017-10-26 | Nishimura, Dan | NIS130 | 0.5 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | clean up | One Time Client | 2017-10-27 18:28:47 | 0 |
2017-10-23 | Nishimura, Dan | NIS130 | 6.5 | ST | Linnet | LINN85 | 5038 | Rock Work | stairs | One Time Client | 2017-10-23 18:12:49 | 0 |
2017-10-20 | Nishimura, Dan | NIS130 | 8.5 | ST | Linnet | LINN85 | 5038 | Rock Work | stairs and bench | One Time Client | 2017-10-21 10:05:26 | 0 |
2017-10-19 | Nishimura, Dan | NIS130 | 9 | ST | Linnet | LINN85 | 5038 | Rock Work | stairs and bench | One Time Client | 2017-10-19 20:18:55 | 0 |
2017-10-18 | Nishimura, Dan | NIS130 | 9.5 | ST | Linnet | LINN85 | 5038 | Rock Work | unload pallets | One Time Client | 2017-10-18 21:07:28 | 0 |
2017-10-17 | Nishimura, Dan | NIS130 | 0.5 | ST | 832 Newport | 83265 | 5030 | Cleanup and Disposal | clean up | Precision Marble | 2017-10-17 19:50:01 | 0 |
2017-10-17 | Nishimura, Dan | NIS130 | 6.5 | ST | 832 Newport | 83265 | 5004 | Framing | build walls | Precision Marble | 2017-10-17 19:50:24 | 0 |
2017-10-16 | Nishimura, Dan | NIS130 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | build exterior wall-1trusses-8.5 | One Time Client | 2017-10-16 19:59:34 | 0 |
2017-10-13 | Nishimura, Dan | NIS130 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | trusses and ship lap | One Time Client | 2017-10-13 19:08:04 | 0 |
2017-10-12 | Nishimura, Dan | NIS130 | 10 | ST | Cowichan Lake | COWI76 | 5004 | Framing | frame top floor | One Time Client | 2017-10-12 21:31:39 | 0 |
2017-10-12 | Nishimura, Dan | NIS130 | 0.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | clean up | One Time Client | 2017-10-13 19:07:09 | 0 |
2017-10-11 | Nishimura, Dan | NIS130 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | lvl, flooring | One Time Client | 2017-10-11 21:34:40 | 0 |
2017-10-10 | Nishimura, Dan | NIS130 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | frame walls and fur out | One Time Client | 2017-10-10 20:02:45 | 0 |
2017-10-07 | Nishimura, Dan | NIS130 | 1 | ST | 832 Newport | 83265 | 5006 | Foundation | return whailer bars | Precision Marble | 2017-10-07 15:51:34 | 0 |
2017-10-06 | Nishimura, Dan | NIS130 | 8.5 | ST | Cowichan Lake | COWI76 | 5024 | Electrical Work | backfill/pipes and help the electricians | One Time Client | 2017-10-07 15:50:58 | 0 |
2017-10-05 | Nishimura, Dan | NIS130 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | walls and floor | One Time Client | 2017-10-05 19:52:32 | 0 |
2017-10-04 | Nishimura, Dan | NIS130 | 10 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | backfill basement | One Time Client | 2017-10-04 20:28:22 | 0 |
2017-10-03 | Nishimura, Dan | NIS130 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | floor joist and sheeting | One Time Client | 2017-10-03 18:57:29 | 0 |
2017-10-02 | Nishimura, Dan | NIS130 | 7.5 | ST | Cowichan Lake | COWI76 | 5010 | Perimeter Drains | backfill foundation and sewer pipes | One Time Client | 2017-10-02 18:02:50 | 0 |
2017-10-31 | Schroeder, Travis | SCH131 | 8.5 | ST | 714 Newport | 71464 | 5029 | Cabinets | installing the laundry cabinetinstalling the front door and outside trim, rip out master bedroom floor | Precision Marble | 2017-11-02 23:25:09 | 0 |
2017-10-30 | Schroeder, Travis | SCH131 | 2.5 | ST | 714 Newport | 71464 | 5029 | Cabinets | Making the laundry cabinet for the hot water cover | Precision Marble | 2017-11-02 23:23:00 | 0 |
2017-10-27 | Schroeder, Travis | SCH131 | 1.5 | ST | Linnet | LINN85 | 5038 | Rock Work | cleaning up rock and grouting and cleaning deck | One Time Client | 2017-10-30 10:15:06 | 0 |
2017-10-25 | Schroeder, Travis | SCH131 | 9 | ST | Linnet | LINN85 | 5038 | Rock Work | grouting stairsfinished installing and grouting bench | One Time Client | 2017-10-30 10:17:13 | 0 |
2017-10-23 | Schroeder, Travis | SCH131 | 4 | ST | Linnet | LINN85 | 5038 | Rock Work | grouting stairs | One Time Client | 2017-10-30 10:13:10 | 0 |
2017-10-20 | Schroeder, Travis | SCH131 | 6.5 | ST | Linnet | LINN85 | 5038 | Rock Work | installing stair treadsnext 2 levels of bench | One Time Client | 2017-10-20 20:02:30 | 0 |
2017-10-19 | Schroeder, Travis | SCH131 | 4 | ST | Linnet | LINN85 | 5038 | Rock Work | installed base of benchinstalling stair treads | One Time Client | 2017-10-20 20:01:27 | 0 |
2017-10-18 | Schroeder, Travis | SCH131 | 1 | ST | Linnet | LINN85 | 5038 | Rock Work | installing stair tread | One Time Client | 2017-10-18 19:18:51 | 0 |
2017-10-16 | Schroeder, Travis | SCH131 | 3.5 | ST | Linnet | LINN85 | 5038 | Rock Work | sorting out rockinstalling fire pit | One Time Client | 2017-10-18 19:17:21 | 0 |
2017-10-19 | Smith, John | SMI132 | 1.5 | ST | Black Residence | BLAC70 | 5024 | Electrical Work | went over all electrical with Adam and framing needed by Kyler and cole for electrical,another coat of paint on coat hook base | Cats Eye Contracting | 2017-10-19 17:57:25 | 0 |
2017-10-13 | Smith, John | SMI132 | 1 | ST | Black Residence | BLAC70 | 5011 | Interior Finishing | went over details of sub floor and strapping cieling with kyler and cole,finished painting wooden hook rack for bathroom door,ready to be installed | Cats Eye Contracting | 2017-10-13 18:03:19 | 0 |
2017-10-12 | Smith, John | SMI132 | 5 | ST | Black Residence | BLAC70 | 5004 | Framing | went over details of pourch with David,picked up last of floor mateials,fixed screw gun again because guys are retards,helped finish off sub floor | Cats Eye Contracting | 2017-10-12 18:36:21 | 0 |
2017-10-11 | Smith, John | SMI132 | 1.5 | ST | Black Residence | BLAC70 | 5017 | Demolition | showed boys how to fix, or adjust the screw gun they told me did not work, works just fine, helped brandon remove pump from small cabin, | Cats Eye Contracting | 2017-10-11 21:47:12 | 0 |
2017-10-06 | Smith, John | SMI132 | 4.5 | ST | Black Residence | BLAC70 | 5004 | Framing | picked up materials for framing in windows and insulating, temporarly waiting for windows,helped withthis acordingly by Davids request,picked up finial for light in bathroom and installed | Cats Eye Contracting | 2017-10-06 17:46:05 | 0 |
2017-10-05 | Smith, John | SMI132 | 3.5 | ST | Black Residence | BLAC70 | 5004 | Framing | insulated exterior walls went over floor details with kyler and cole | Cats Eye Contracting | 2017-10-05 17:49:46 | 0 |
2017-10-04 | Smith, John | SMI132 | 2 | ST | Black Residence | BLAC70 | 5004 | Framing | measured up insulation helped kyler with framing | Cats Eye Contracting | 2017-10-05 17:48:11 | 0 |
2017-10-03 | Smith, John | SMI132 | 2.5 | ST | Black Residence | BLAC70 | 5004 | Framing | picked up materials,delivered and went over framing details with kyler cole and methods of insulation with Damon | Cats Eye Contracting | 2017-10-05 17:46:33 | 0 |
2017-10-02 | Smith, John | SMI132 | 1.5 | ST | Black Residence | BLAC70 | 5004 | Framing | worked with cole kyler and damon on procedures | Cats Eye Contracting | 2017-10-05 17:43:49 | 0 |
2017-10-31 | West, Andrew | WES134 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | sub floor at front entrance, cabinet around waterheater | Precision Marble | 2017-11-14 18:26:06 | 0 |
2017-10-30 | West, Andrew | WES134 | 8 | ST | 714 Newport | 71464 | 5011 | Interior Finishing | Remove floor, sub floor at front entrance cabinets at durants | Precision Marble | 2017-11-14 18:25:05 | 0 |
2017-10-27 | West, Andrew | WES134 | 8 | ST | Linnet | LINN85 | 5038 | Rock Work | Move rock to Durants | One Time Client | 2017-11-14 18:23:53 | 0 |
2017-10-26 | West, Andrew | WES134 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Help with stairs | One Time Client | 2017-10-26 20:42:51 | 0 |
2017-10-25 | West, Andrew | WES134 | 4.5 | ST | 714 Newport | 71464 | 5006 | Foundation | Poor slab in garage | Precision Marble | 2017-10-26 04:57:42 | 0 |
2017-10-25 | West, Andrew | WES134 | 2 | ST | 832 Newport | 83265 | 5006 | Foundation | poor slab in garage | Precision Marble | 2017-10-26 04:58:22 | 0 |
2017-10-24 | West, Andrew | WES134 | 6.5 | ST | 714 Newport | 71464 | 5030 | Cleanup and Disposal | Pick up lewis truck, to dump to durants, clean up | Precision Marble | 2017-10-24 18:52:22 | 0 |
2017-10-23 | West, Andrew | WES134 | 8.5 | ST | 714 Newport | 71464 | 5004 | Framing | Demo wall inside garage , facia and soffit | Precision Marble | 2017-10-23 20:13:14 | 0 |
2017-10-20 | West, Andrew | WES134 | 7.5 | ST | 714 Newport | 71464 | 5004 | Framing | Frame by garage | Precision Marble | 2017-10-23 20:12:35 | 0 |
2017-10-19 | West, Andrew | WES134 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | Framing , help with stairs | Precision Marble | 2017-10-23 20:11:42 | 0 |
2017-10-18 | West, Andrew | WES134 | 8 | ST | 832 Newport | 83265 | 5004 | Framing | Framing basement | Precision Marble | 2017-10-23 20:09:54 | 0 |
2017-10-17 | West, Andrew | WES134 | 7 | ST | 832 Newport | 83265 | 5004 | Framing | frame basement | Precision Marble | 2017-10-23 20:09:09 | 0 |
2017-10-16 | West, Andrew | WES134 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Sheeting, trusses, outrigers | One Time Client | 2017-10-23 20:05:21 | 0 |
2017-10-12 | West, Andrew | WES134 | 11 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Framing | One Time Client | 2017-10-23 20:03:12 | 0 |
2017-10-11 | West, Andrew | WES134 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Framing ,some sheeting, lvl | One Time Client | 2017-10-23 20:02:05 | 0 |
2017-10-10 | West, Andrew | WES134 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Frame first floor, fur wall on second | One Time Client | 2017-10-10 20:22:52 | 0 |
2017-10-06 | West, Andrew | WES134 | 8.5 | ST | Cowichan Lake | COWI76 | 5024 | Electrical Work | Dig and fill trench, help adam, | One Time Client | 2017-10-10 20:21:48 | 0 |
2017-10-05 | West, Andrew | WES134 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Frame wall by stairs, clean, sheet wall | One Time Client | 2017-10-10 20:20:56 | 0 |
2017-10-04 | West, Andrew | WES134 | 10 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | Backfill basement, some drainrock | One Time Client | 2017-10-10 20:19:35 | 0 |
2017-10-03 | West, Andrew | WES134 | 9.5 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Frame floor and walls | One Time Client | 2017-10-10 20:18:42 | 0 |
2017-10-02 | West, Andrew | WES134 | 7.5 | ST | Cowichan Lake | COWI76 | 5007 | Excavation and Backfill | Strip inside footings, backfill | One Time Client | 2017-10-10 20:18:04 | 0 |
2017-10-31 | Wison, Coleton | WIS135 | 9 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | Worked on the retaining walls, tying regar and started to 'button up'. Helped Lewis and Sam at the end with beams/trusses. | One Time Client | 2017-10-31 18:28:25 | 0 |
2017-10-30 | Wison, Coleton | WIS135 | 8.5 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | Worked with Nate on the retaining wall formwork, put in shiplap and tied rebar. | One Time Client | 2017-10-30 18:31:28 | 0 |
2017-10-27 | Wison, Coleton | WIS135 | 8.5 | ST | Cowichan Lake | COWI76 | 5006 | Foundation | Worked with Nate and Dean on the two retaining walls on the south end of the house. | One Time Client | 2017-10-27 18:20:59 | 0 |
2017-10-26 | Wison, Coleton | WIS135 | 9 | ST | Cowichan Lake | COWI76 | 5004 | Framing | Dug with Dean for footings on retaining wall. Drove to Duncan and back for materials. Did some siding and helped clean up. | One Time Client | 2017-10-27 18:20:02 | 0 |
2017-10-25 | Wison, Coleton | WIS135 | 5 | ST | Black Residence | BLAC70 | 5026 | Drywall | put up the last of the drywall and cleaned up. | Cats Eye Contracting | 2017-10-25 18:23:55 | 0 |
2017-10-25 | Wison, Coleton | WIS135 | 3.5 | ST | Linnet | LINN85 | 5038 | Rock Work | Worked at cleaning up grout on the granite. | One Time Client | 2017-10-25 18:24:32 | 0 |
2017-10-24 | Wison, Coleton | WIS135 | 6 | ST | Black Residence | BLAC70 | 5026 | Drywall | Worked with Sam Morris at putting up some drywall. Cleaned up. Made a dump run. Also made a trip to Lumberworld. | Cats Eye Contracting | 2017-10-24 18:04:44 | 0 |
2017-10-24 | Wison, Coleton | WIS135 | 2.5 | ST | Linnet | LINN85 | 5038 | Rock Work | Worked with Damon at cleaning up grout. Made a quick trip to Durrance for a vacuum. Cleaned up tools at the end of day. | One Time Client | 2017-10-24 18:06:03 | 0 |
2017-10-23 | Wison, Coleton | WIS135 | 9.5 | ST | Black Residence | BLAC70 | 5026 | Drywall | Worked on drywalling. Made a quick trip to lumberworld for some materials. Finished by quickly checking out and tucking in the big blue tarp. | Cats Eye Contracting | 2017-10-23 21:08:10 | 0 |
2017-10-20 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5026 | Drywall | Went to Lumberworld to pick up materials. Acoustically sealed windows that I worked on. Started to put up drywall. Finished with a quick clean up. | Cats Eye Contracting | 2017-10-20 16:18:40 | 0 |
2017-10-19 | Wison, Coleton | WIS135 | 7.5 | ST | Black Residence | BLAC70 | 5004 | Framing | Worked with Kyler at framing in some interior windows apart of the wall for the electricians. Reinsulated, poly'd the walls. Cleaned up. Layed a couple of pieces of subfloor. | Cats Eye Contracting | 2017-10-19 18:57:27 | 0 |
2017-10-18 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5026 | Drywall | Finished drywalling ceiling with Kyler. Made a trip to lumberworld for a couple of things. Put in backing for wallboard. Cleaned up. | Cats Eye Contracting | 2017-10-18 16:51:33 | 0 |
2017-10-17 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5026 | Drywall | Worked with Kyler on shimming and adjusting ceiling straps so as to be level. Made a trip to lumberworld for materials etc. Put up poly on ceiling and then started to drywall. | Cats Eye Contracting | 2017-10-17 15:56:51 | 0 |
2017-10-16 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5004 | Framing | Strapped the ceiling for drywall with Kyler. | Cats Eye Contracting | 2017-10-16 16:23:32 | 0 |
2017-10-13 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5004 | Framing | Worked on rest of subfloor with Kyler, cleaned up, finished insulating, made a trip to Hartland, started to strap ceiling for drywall. | Cats Eye Contracting | 2017-10-13 17:19:37 | 0 |
2017-10-12 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5001 | Flooring | Finished blocking, cleaning and insulating cavities. Laid subfloor and started to lay 3/8 for tile. | Cats Eye Contracting | 2017-10-12 16:51:28 | 0 |
2017-10-11 | Wison, Coleton | WIS135 | 6 | ST | Black Residence | BLAC70 | 5004 | Framing | Worked with Kyler at putting in straps and insulation and flooring. Finished with a clean up. | Cats Eye Contracting | 2017-10-11 16:52:25 | 0 |
2017-10-10 | Wison, Coleton | WIS135 | 8.5 | ST | Black Residence | BLAC70 | 5004 | Framing | Drilled holes in blocking for cross-ventilation, cleaned up, worked with Kyler at putting in insulation and 3/4 inch subfloor. | Cats Eye Contracting | 2017-10-10 17:49:05 | 0 |
2017-10-06 | Wison, Coleton | WIS135 | 5 | ST | 832 Newport | 83265 | 5006 | Foundation | Was at Lumberworld for materials, helped Nate finish off formwork for stairs, put in rebar, prepped slab for pouring. | Precision Marble | 2017-10-06 16:44:25 | 0 |
2017-10-06 | Wison, Coleton | WIS135 | 4 | ST | Black Residence | BLAC70 | 5004 | Framing | Worked with Kyler at boarding up windows, cleaning up, also had a trip to Durrance and Lumberworld for materials and supplies. | Cats Eye Contracting | 2017-10-06 16:42:47 | 0 |
2017-10-04 | Wison, Coleton | WIS135 | 8 | ST | Black Residence | BLAC70 | 5004 | Framing | continued to frame in around in windows, cleaned up, started to tear up the sub-floor. | Cats Eye Contracting | 2017-10-04 16:29:36 | 0 |
2017-10-03 | Wison, Coleton | WIS135 | 7.5 | ST | Black Residence | BLAC70 | 5004 | Framing | Worked with Kyler at framing around windows. Also loaded the bin with junk wood, finished with clean up. | Cats Eye Contracting | 2017-10-03 17:01:41 | 0 |
2017-10-02 | Wison, Coleton | WIS135 | 8.5 | ST | #2 Uptown Addition | #2U111 | 5004 | Framing | Tore out old framing and framed in new headers, cripples etc. Finished with a clean up. | Heatherbrea | 2017-10-02 16:54:22 | 0 |